This page provides information to owners and operators of gasoline stations. For downloading instructions, see How to View and Download Documents.
Advisories
Date | Advisory |
11/21/2019 | Updated GDF Emission Factors for Stations with Phase I EVR and Phase II EVR |
11/21/2019 | Updated Form -25T (Gasoline Station Health Risk Assessment Application Form). |
10/25/2017 | Updated Annual Reporting Form ENF-58 |
2/24/2015 | Revised ARB Special Advisory 405-C – Extends ISD Winter Fuel Enforcement Policy to March 31. See Advisory 405-C on this Air Resources Board Website. |
4/14/2014 | APCD advisory for AST permit holders regarding ARB Regulatory Advisory. |
3/4/2014 | ARB Regulatory Advisory provides flexibility to owners and operators of aboveground storage tanks (ASTs) subject to Phase I EVR requirements. See the advisory on this Air Resource Board website. |
11/9/2011 | Revised ARB Special Advisory 405-B – Ammendments to the Current ISD Enforcement Policy. See Advisory 405-B on this Air Resources Board Website. |
3/9/2011 | EVR extension for gasoline dispensing facilities with bulk plants. See Executive Order G-70-215 and cover letter to stakeholders. |
12/1/2010 | Revised ARB Special EVR Advisory 405-A – Ammendments to the Current ISD Enforcement Policy see this file on the Air Resources Board website. |
12/1/2010 | Revised ARB Special EVR Advisory 405-A – Training Announcement see this file on the Air Resources Board website. |
12/1/2010 | ARB Special Advisory 408 requires EVR-certified replacement parts for all Pre-EVR ballance vapor reovery systems. See this file on the Air Resources Board website. |
12/1/2010 | New Aboveground Storage Tank (AST) Supplemental Application Form-25A now available. |
12/1/2010 | Application forms Form-25 and Form-25E have been updated. |
Forms – Testing
Test data shall be submitted to the APCD using APCD or CARB approved test forms. See Table T of your permit for site specific requirements.
- Maximum Product Flow Rate Test Form ENF-82
- APCD Repair Log Form ENF-99 and Service Repair Sheet Form ENF-99a
- Static Leak Decay Test (TP-201.3), ARB Form
- Liquid Removal Test (Exhibit 5)
- Leak Rate and Cracking Pressure of P/V Vent Valves (TP-201.1E)
- Static Torque of Phase I Adapters (TP-201.1B)
- Pressure Integrity Test of Drop Tube/Drain Assembly (TP-201.1C)
- Pressure Integrity Test of Drop Tube/Drain Assembly (TP-201.1D)
- Static Pressure Performance of Healy Clean Air Separator (Exhibit 4)
- Healy Test Form Sides A & B
- Dynamic Back Pressure and Liquid Blockage Test (TP-201.4), ARB Form
- ARB Test Procedures Page (includes Forms)
- Test Data to be Submitted with PTO Application Checklist
Forms – For the Owner/Operator
- APCD Repair Log Form ENF-99 and Service Repair Sheet Form ENF-99a
- Daily and Weekly Healy Maintenance Checklist ENF-100, (MS Excel)
- Instructions/How To Perform Weekly Healy Pump Check ENF-100A
Forms – Applications/Annual Report
- Gasoline Station Form -25 (see Form -25P for PTO applications)
- Supplemental Phase II EVR and ORVR Application Form -25E
- Supplemental Aboveground Storage Tank (AST) Application Form-25A
- Gasoline Station Form -25P (use if you have a ATC and need a PTO only)
- Gasoline Station Health Risk Assessment Form -25T
- Authorized Agent Form -01A
- Bulk Fuel Plant Form -25b (also requires Form -01
- General Application Form -01
- Annual Reporting Form ENF-58
Old Advisories
- 10/06/09: ARB Special EVR Advisory 405 – Amendments to the Current ISD Enforcement Policy see this file on the Air Resources Board website.
- 02/18/09: Phase II EVR Deadline: Information on Stipulated Order of Abatement Process here
- 01/11/08: Application forms Form -25 ,Form -25E and Form -25T updated.
- 09/10/07: Grants and loans are available to replace/repair underground storage tanks. See: http://www.waterboards.ca.gov/cwphome/ustcf/rust.html.
- 01/31/07: Franklin/Healy Product Support Memo
- 01/04/07: ARB Advisory #357 – ISD Software Upgrade Ver 1.01
- 12/12/06: New APCD PTO Application Form -25P. Use this form only if you currently have an ATC permit and need a PTO. Use the existing forms Form -25 and Form -25E for all other applications.
- 05/05/06: APCD Repair Log Form ENF-99 and Service Repair Sheet ENF-99a is required for use by station operators.
- 05/05/06: TriTester Digital V/L device approved for Healy EVR systems
- 05/30/05: Healy Phase II EVR Clean Air Separator Advisory
Useful Information and Links
- APCD Gas Station Phase I and Phase II EVR Emission Factor Memo
- ARB’s Aboveground Storage Tank FAQ
- Videos from San Diego Air Pollution Control District Covering Various Aspects of Vapor Recovery Systems
- Presentation by ARB on Aboveground Storage Tanks – EVR (April 2009)
- Booklet on In-Station Diagnostics Vapor Recovery Monitoring Systems
- Phase II EVR Equipment Descriptions
- VST Product Bulletin
- Veeder-Root Carbon Canister Brochure
- Veeder-Root Carbon Canister Regulator Training PowerPoint Presentation
- ARB Vapor Recovery Webpage
- Phase I and Phase II Executive Orders
- EVR Timeline (updated June 2006)
- Veeder-Root ISD PowerPoint Presentation
- “How ISD Works” by Veeder-Root
- ARB and SCAQMD June 26, 2007 ISD Workshop Presentations
- Franklin/Healy Product Support Memo
- APCD Rule 316: Storage and Transfer of Gasoline
- ARB’s Vapor Recovery FAQ
- G-70-124 (Bulk Plant Certification)
For more information or assistance, call or email Paula Andrews at (805) 961-8867.
Return to Engineering Programs